With the fabridam lowered for the season, excavation resumes at the riverboat dock site. The slip is being dug to its final depth and lined with stone. Rough grading and the layout for parking has started. Sidewalks, parking spaces, utilities, and final grading will continue at a later date.





Comments are closed